Skip to content
CAD building elevation in light and dark themes with DWG export icon and layer color palette.
Thought Leadership

From pieces to progress: Make construction project data work for you

2 Minutes Read
|

Share this post:

CAD building elevation in light and dark themes with DWG export icon and layer color palette.

Summary

Disconnected project data creates project risks. SketchUp helps AEC design and build teams manage that risk for on-time delivery by turning data complexity into insights. Read on to see how.

The design of any constructible project entails countless moving pieces and lots of data—models, drawings, markups, schedules, site data, environmental surveys, budgets, etc. Each piece tells part of the story. But when those pieces aren’t integrated, workflows break…and project pain ensues.

AEC leaders see that data disconnect every day. Someone’s updating an architecture model while the cost estimate lives in a separate spreadsheet. A new site scan arrives late, and integrating it creates rework for the design team. GCs don’t have timely access to designs to support construction planning, making it harder to create constructable site models, sequence work and plan site logistics.

The information exists—it’s just too scattered to be useful. Successful delivery of complex projects on tight timelines hinges on workflow efficiency. So when workflows break, whether in design, planning, or on-site, there are material reputational and financial risks for design and build firms.

SketchUp helps protect users’ brands and margins by unlocking the integration of diverse data and file types so project teams can focus on quality of delivery—not wrangling files.


Win and deliver higher quality projects on time with less risk with Sketchup.


Industrial loft interior rendering with glass partitions, spiral stair, bar counter, and shelves with plants.

Impact in action

Mumbai-based studio STaND Design used SketchUp’s 3D modeling, visualization and AR capabilities to transform a century-old fabric mill into a contemporary cacao processing and visitor center. By combining detailed site surveys, photogrammetry and immersive visualization in SketchUp, they preserved the building’s heritage, repurposing original elements, while modernizing it for a new purpose.

SketchUp played a pivotal role in the design and planning of the Subko Cacao Mill. Its versatile capabilities and user-friendly interface significantly expedited the entire design process.
Siddhant Tikkoo
Principal Architect, STaND Design

Read the case study


Disconnected data costs time, money, and reputation

A 2023 industry report found that as many as one in three projects are disrupted by design errors, driven by a lack of tool and team integration.

But firms that unify their design and construction data with SketchUp report measurable gains: about 5% less rework. Higher quality designs yield more constructable models and better documentation for more accurate logistics planning, and fewer issues on-site.

How we do it:

  • Unified data: SketchUp supports open formats like IFC, Revit, DWG and point clouds, letting design and construction teams coordinate seamlessly across platforms, regardless of what other tools you use.

  • Better collaboration: Every model, markup and version stays organized and accessible, anywhere, with Trimble Connect. In-app commenting, real-time viewing and private sharing allow for focused, contextualized collaboration.

  • Contextual design: Site data from point clouds ground design and construction planning in real-world conditions, enabling better project planning and estimating for seamless execution from studio to site.


Stone exterior suburban house with gabled roof, many windows, front porch, and landscaped yard in daylight.

Impact in action

Design-build firm PSW cut average project design time from five hours to 20 mins (a 93% savings) by bringing point-cloud data directly into SketchUp.

SketchUp also made the work more accurate. 3D scans and point-cloud data replaced manual tape measurements and triangulation, which also created labor savings. That kind of speed, clarity and efficiency adds up fast on tight timelines.

Using Scan Essentials gives us the accuracy we need. A few inches off is a problem in our world. Sometimes we work in properties where we build up to the allowable setback. If we were off by a few inches, the second point related to the setback would be off by a couple more inches. Four more points down, and you're off by a foot.
TJ Varghese
Design Director, PSW

Read the case study


Accelerating construction workflows, one step at a time

Bring Revit models, IFCs, point clouds, GIS files, 2D drawings and even job-site sketches together with SketchUp. A single, intuitive environment that connects design coordination with construction planning and management to help you move smoothly from early design through on-site execution without losing context or data.


Win and deliver higher quality projects on time with less risk with Sketchup.


Related Articles

Prevent rework, create clarity: From ideation to execution
article

Prevent rework, create clarity: From ideation to execution

Rework erodes margin and trust. And it’s caused by unclear expectations and lapses in coordination, ...
Read full article
Win more work: Build a brand on stunning designs and on-time job delivery
article

Win more work: Build a brand on stunning designs and on-time job delivery

In a competitive market, design-build firms and GCs win by combining speed, polish and a track recor...
Read full article
SketchUp 2023’s renaissance duo — meet Heather and Lily
article

SketchUp 2023’s renaissance duo — meet Heather and Lily

Meet SketchUp for Desktop’s new scale figures, Heather and her fierce but sweet cat, Lily. From urba...
Read full article

Ready to get started?